POWERLINE SURVEYS – PRELIMINARY

- Individual Ownership Sketch Plans
- Adjusted base maps
- Topographic Survey
- Legal Survey of Site Boundary (Substation)
- Geotechnical Staking
- Surface Rights Board Individual Ownership Sketch Plans
- Typical Crossing Plans
- Major Crossing Plans
- Control Survey
- Flagging
- Centerline Survey
POWERLINE SURVEYS – CONSTRUCTION

- Right of Way Staking
- Pile Layout/cutoffs
- Pole/Anchor Staking
- Ground Grid Layout
- AS-built Surveys
- Legal Survey of Powerline Right of Way
- Pad & Access Layout
- Quantity Surveys (Stripping, Ground bed, Sub-grade)
PIPELINE SURVEYS – PRELIMINARY
- Individual Ownership Sketch Plans
- Adjusted base maps
- Topographic Survey
- Geotechnical Staking
- Surface Rights Board Individual Ownership Sketch Plans
- Typical Crossing Plans
- Major Crossing Plans
- Control Survey
- Flagging
- Ditch line Alignment
PIPELINE SURVEYS – CONSTRUCTION
- Right of Way, Ditchline, Workspace Staking
- Punchlist Verification/staking
- AS-built Survey
- Legal Survey of Pipeline Right of Way
PIPELINE SURVEYS – LOW PRESSURE
- Topographic Survey
- Control Survey
- Individual Ownership Sketch Plans
- Adjusted base maps
- Construction Plans (IFC)
- Typical Crossing Plans
- Major Crossing Plans
- Ditchline Staking